Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Third ship delivered by Govan
News

August 4, 2006 · about 20 years ago

Third ship delivered by Govan

The Ministry of Defence took delivery yesterday of the third of a four-strong class of naval landing ships built at Govan to support British military operations worldwide. The 16,000-tonne Cardigan Bay will join its Royal Fleet Auxiliary sisters Mounts Bay and Largs Bay after completing sea trials.

1 minutes read
  • LinkedIn
  • X
  • Email

The Ministry of Defence took delivery yesterday of the third of a four-strong class of naval landing ships built at Govan to support British military operations worldwide. The 16,000-tonne Cardigan Bay will join its Royal Fleet Auxiliary sisters Mounts Bay and Largs Bay after completing sea trials. The fourth vessel, Lyme Bay is to be completed at BAE Systems Govan after her transfer to the Clyde from the Swan Hunter yard on Tyneside because of design problems and cost overruns.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free