Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Terra Nova FPSO Off Dry Dock, Production to Resume in Late October
News

September 1, 2006 · about 20 years ago

Terra Nova FPSO Off Dry Dock, Production to Resume in Late October

Petro-Canada today announced the completion of planned dry dock work on the Terra Nova Floating Production Storage and Offloading vessel (FPSO). The vessel is currently moored at dockside in the Keppel Verolme (KV) shipyard in Rotterdam, The Netherlands, for completion of a maintenance turnaround. I

1 minutes read
  • LinkedIn
  • X
  • Email

Petro-Canada today announced the completion of planned dry dock work on the Terra Nova Floating Production Storage and Offloading vessel (FPSO). The vessel is currently moored at dockside in the Keppel Verolme (KV) shipyard in Rotterdam, The Netherlands, for completion of a maintenance turnaround. It moved from the dry dock to dockside on August 24, and is scheduled to sail for the field in mid-September.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free