Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Triple whammy finally splits the Napoli in two
News

August 1, 2007 · about 19 years ago

Triple whammy finally splits the Napoli in two

IT was third time lucky for salvage contractors attempting to split the stricken MSC Napoli in two, as the ship was finally separated. The operation to split the 62,000-ton cargo ship was carried out in two stages. First cutting charges were placed in front of the accommodation block to cut through

1 minutes read
  • LinkedIn
  • X
  • Email

IT was third time lucky for salvage contractors attempting to split the stricken MSC Napoli in two, as the ship was finally separated.

The operation to split the 62,000-ton cargo ship was carried out in two stages. First cutting charges were placed in front of the accommodation block to cut through the deck plates of the vessel, which would then expose the longitudinal joists.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free