BW Offshore confirmed the signing of the contract for the conversion, installation and operation of a floating production, storage and offloading vessel (FPSO) at the Petrobras-operated deepwater Chinook and Cascade fields in the U.S. Gulf of Mexico.
The contract is for a total of up to eight years including option periods of up to three years.