Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›HMC Successfully Installs Shell’s Perdido Topsides
News

March 19, 2009 · about 17 years ago

HMC Successfully Installs Shell’s Perdido Topsides

Heerema Marine Contractors (HMC) has completed installation of the 9,500 t topsides and living quarters atop the floating Spar of the Shell Perdido project. The installation took place at a water depth of almost 2,500 meters in the Gulf of Mexico. HMC’s Thialf is one of only two vessels in the world

1 minutes read
  • LinkedIn
  • X
  • Email

Heerema Marine Contractors (HMC) has completed installation of the 9,500 t topsides and living quarters atop the floating Spar of the Shell Perdido project. The installation took place at a water depth of almost 2,500 meters in the Gulf of Mexico. HMC’s Thialf is one of only two vessels in the world capable of lifting the 9,500 t topsides.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free