Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Panama Canal prepares for fourth dry excavation project
News

July 2, 2009 · about 17 years ago

Panama Canal prepares for fourth dry excavation project

The Panama Canal Authority (ACP) will soon solicit bids for the fourth and last dry excavation project. The project will be the final phase in creating an access channel that will link the new Pacific locks with the canal’s existing Gaillard Cut, the narrowest stretch of the Panama Canal. The scope

1 minutes read
  • LinkedIn
  • X
  • Email

The Panama Canal Authority (ACP) will soon solicit bids for the fourth and last dry excavation project. The project will be the final phase in creating an access channel that will link the new Pacific locks with the canal’s existing Gaillard Cut, the narrowest stretch of the Panama Canal.

The scope of work will include the excavation, removal and disposal of approximately 27 million cubic metres of non-classified material.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free