Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›GoM Spill: BP Successfully Installs Capping Stack on MC252 Well
Equipment

July 13, 2010 · about 16 years ago

GoM Spill: BP Successfully Installs Capping Stack on MC252 Well

The three ram capping stack was installed on the Deep Water Horizon LMRP at 7 p.m. CDT. The stack completes the installation of the new sealing cap. Following installation of the capping stack and in line with the procedure approved by the National Incident Commander and Unified Area Command, the we

2 minutes read
  • LinkedIn
  • X
  • Email

The three ram capping stack was installed on the Deep Water Horizon LMRP at 7 p.m. CDT. The stack completes the installation of the new sealing cap.

Following installation of the capping stack and in line with the procedure approved by the National Incident Commander and Unified Area Command, the well integrity test will begin July 13 on the MC252 well.

For the duration of the test, which will be a minimum of 6 hours and could extend up to 48 hours, the three ram capping stack will be closed and all sub-sea containment systems (namely, the Q4000 and Helix Producer) will be temporarily suspended, effectively shutting in the well. It is expected, although cannot be assured, that no oil will be released to the ocean for the duration of the test. This will not however be an indication that flow from the wellbore has been permanently stopped.

Information gathered during the test will be reviewed with the relevant government agencies including the federal science team to determine the way forward. Options include reinstatement of containment as well as extending the test duration beyond 48 hours.

The Capping Stack BOP is skidded onboard the Transocean Discoverer Inspiration to mate with the Vetco and EDS Control panel on top of the moon pool July 09, 2010

The sealing cap system never before has been deployed at these depths or under these conditions, and its efficiency and ability to contain the oil and gas cannot be assured.

The Helix Producer containment system started operations on July 12. The Q4000 containment system continues to capture oil and gas from the MC252 well and flare the hydrocarbons safely at the surface

Relief well operations continue throughout this period and remain the sole means to permanently seal and isolate the well.

[mappress]

Source: BP,July 13, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago