Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›USA: Deepwater*s Retrofit Vessel is Replacing Anodes Throughout the Gulf of Mexico
Equipment

August 25, 2010 · about 16 years ago

USA: Deepwater*s Retrofit Vessel is Replacing Anodes Throughout the Gulf of Mexico

Deepwater Corrosion’s retrofit boat is working in the Eastern gulf. The boat will migrate Westward over the summer and be available for South Texas by the end of the summer season. The boat will be totally self sufficient to perform retrofits on structures in less than 90 fsw. The retrofits will be

1 minutes read
  • LinkedIn
  • X
  • Email

Deepwater Corrosion’s retrofit boat is working in the Eastern gulf. The boat will migrate Westward over the summer and be available for South Texas by the end of the summer season.

The boat will be totally self sufficient to perform retrofits on structures in less than 90 fsw. The retrofits will be performed using Deepwater’s RetroLink system. This is a diver-less topside installed system. Retrolink is designed to be a five year, replaceable system.

The retrofit boat will be manned by a five to seven man crew depending on the size of the structure. Most multi-legged structures can be completed in less than a day, with caissons taking less than an hour once the boat is on location. Installation time will vary with the number of legs and water depth. In 2009 installation costs ran approximately $3000 Per link or, for multi-legged structures, $4000 per leg.

Material cost will vary depending on the price of Aluminum at time of proposal. At the present time Aluminum prices hover around $2000 / Tonne. Material costs would be as follows:

30’ Retrolink – $1500

60’ Retrolink – $2250

90’ Retrolink – $3000

For costing purposes on multi-leg structures use 1.3 links per leg. Most caissons with CP readings above -.750mV can be retrofit with one link per caisson. The attachment of RetroLink to asset can be either weld-on or clamped.

[mappress]

Source: stoprust, August 25, 2010:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 2 months ago