Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›UK: Ithaca Energy Gets Approval for Athena Field Development Plan
Project & Tenders

September 22, 2010 · about 16 years ago

UK: Ithaca Energy Gets Approval for Athena Field Development Plan

Ithaca Energy Inc. and its wholly owned subsidiary Ithaca Energy (UK) Limited (“Ithaca” or the “Company”), an independent oil & gas company with exploration, development and production assets in the UK sector of the North Sea, is pleaannounced it has received Field Development Plan (“FDP”) approval

2 minutes read
  • LinkedIn
  • X
  • Email

Ithaca Energy Inc. and its wholly owned subsidiary Ithaca Energy (UK) Limited (“Ithaca” or the “Company”), an independent oil & gas company with exploration, development and production assets in the UK sector of the North Sea, is pleaannounced it has received Field Development Plan (“FDP”) approval from the UK Department for Energy and Climate Change (“DECC”) for the Athena oil field.

Gaining FDP approval is a very significant step towards securing first production from the field, which is planned for Q3 2011 at 22,000 barrels of oil per day (“bopd”) (4,950 bopd net to Ithaca) following an independent evaluation of the Company’s petroleum and natural gas reserves by Sproule International Limited . The Athena field is operated by Ithaca.

I ain McKendrick, Chief Executive Officer, commented:

“Since announcing the launch of the Athena development in February of 2010, Ithaca and its Joint Venture partners have worked tirelessly to negotiate contracts that secure a robust development. Ithaca Energy is now in a great position to deliver the next phase of the Athena project, which will involve development drilling and fabrication to meet first production targeted in Q3 2011. FDP approval is a major milestone for any development and testament to the ability and dedication of the Company’s development team and exceptional cooperation between the Joint Venture partners.”

The Company can now continue to swiftly progress the execution of the project which involves engineering and fabrication, and installation in the North Sea, 180 kilometres northeast from Aberdeen.

The initial development consists of four production wells supported by one water injection well. Production will be routed via the subsea manifold and a two kilometre, 8 inch flowline to a stand-alone floating production, storage and offloading (“FPSO”) vessel. Oil production will be exported via shuttle tankers. Produced gas will be used to generate power on the FPSO.

On September 9, 2010, the Company announced the award of two major contracts; the provision of an FPSO and the provision of a semi-submersible drilling. Most principal suppliers to the project have now been selected after a competitive bid process.

The Athena Joint Venture Partners are Ithaca (operator, 22.5%), Dyas UK Ltd (47.5%), EWE Aktiengesellschaft (20%) and Zeus Petroleum Limited (10%).

[mappress]

Source: Ithaca Energy,September 22, 2010,

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago