Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Norway: WGP Successfully Completes BP LoFS no.12 Survey at Valhall
Project & Tenders

October 7, 2010 · about 16 years ago

Norway: WGP Successfully Completes BP LoFS no.12 Survey at Valhall

WGP announced the successful completion of BP’s Valhall Life of Field Seismic (LoFS) no. 12 survey on time and in budget. The M/V Stril Myster has been fully demobilised and returned to supply vessel duties for BP. In 2003 BP installed its LoFS Ocean Bottom Cable (OBC) array and contracted WGP to de

2 minutes read
  • LinkedIn
  • X
  • Email

WGP announced the successful completion of BP’s Valhall Life of Field Seismic (LoFS) no. 12 survey on time and in budget. The M/V Stril Myster has been fully demobilised and returned to supply vessel duties for BP.

In 2003 BP installed its LoFS Ocean Bottom Cable (OBC) array and contracted WGP to design the source system. 8 years and 11 repeat surveys later, WGP was contracted to install and operate the same Portable Source System (PMS), now owned and provided by Thalassa Energy Services Ltd (TESL), to continue to supply the precisely positioned source sub-arrays necessary to acquire the survey data to the highest technical standards with the unmatched repeatability required to maintain and expand upon the quality of the Valhall LoFS 4D database.

Marcus Smith, WGP’s Operations Manager, commented, ”Having been contracted to provide the seismic source for BP’s Valhall LoFS project, WGP’s aim is to provide safe, efficient and flexible surveys for the client to ensure the continuing high value of LoFS. Despite the complications arising from both the weather and time-sharing on a busy prospect in the North Sea during the summer seismic window, WGP’s experienced approach to such operations and familiarity with this technology enabled the Company to meet and surpass BP’s exacting requirements on time and in budget. It was imperative to demonstrate WGP’s capabilities and retain client confidence during the completion of this first survey. With zero lost-time incidents and an average 186km shot per day during operational periods the Company is proud of the achievement which creates a great foundation to build the subsequent surveys on.”

The Valhall LoFS shooting area consists of 179 shot lines spaced 50m apart with an average shot-line length of 14.2km, over 13 permanently installed and trenched receiver lines of GERI OBC. The total number of shots during the LoFS 12 survey was 51,697, an average of 3730 shots per day.

WGP was awarded the 3.5 year, 7 repeat surveys, contract after providing a competitive bid and scoring highly in a rigorous BP HSSE audit. The next phase of BP Valhall LoFS is due to commence in 2011.

[mappress]

Source: wgpgroup, October 7, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago