Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bulgaria: GSP Bigfoot 1 Completes Pipeline Installation at Galata Platform
Business & Finance

October 11, 2010 · about 16 years ago

Bulgaria: GSP Bigfoot 1 Completes Pipeline Installation at Galata Platform

GSP Bigfoot 1 has completed the installation of the 10-in and 6-in pipeline at Galata Platform,on the Bulgarian continental shelf of the Black Sea. According to the contract with Melrose Resources, the technical vessel installed 8.5 kilometers of 6-inch diameter pipeline, 14.5 kilometers of 10-inch

1 minutes read
  • LinkedIn
  • X
  • Email

GSP Bigfoot 1 has completed the installation of the 10-in and 6-in pipeline at Galata Platform,on the Bulgarian continental shelf of the Black Sea.

According to the contract with Melrose Resources, the technical vessel installed 8.5 kilometers of 6-inch diameter pipeline, 14.5 kilometers of 10-inch diameter pipeline, as well as two secondary 1-inch diameter pipelines.

The subsea pipelines connect the Kavarna-2 and Kaliakra-2 subsea wellheads to Galata Platform.

The technical vessel returned to Constanta Sud – Agigea port and prepares for new pipeline operations.

GSP Bigfoot 3, the 300 men work and heavy lift technical vessel, carries out the completion operations and testing. The vessel is assisted by GSP Queen and Amber II.

[mappress]

Source:GSP Offshore, October 11, 2010 ;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago