Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Nass&Wind Offshore to install a wind LIDAR at Grand Léjon lighthouse (France)
Offshore Wind

October 15, 2010 · about 16 years ago

Nass&Wind Offshore to install a wind LIDAR at Grand Léjon lighthouse (France)

Nass&Wind Offshore, one of the leading French developers of offshore wind projects, will shortly install a wind LIDAR at the top of the Grand Léjon lighthouse, located in the bay of Saint-Brieuc off the coast of northern Brittany (France). This new generation device based on Light Detection and Rang

2 minutes read
  • LinkedIn
  • X
  • Email

Nass&Wind Offshore, one of the leading French developers of offshore wind projects, will shortly install a wind LIDAR at the top of the Grand Léjon lighthouse, located in the bay of Saint-Brieuc off the coast of northern Brittany (France).

This new generation device based on Light Detection and Ranging technique relies on the measurement of Doppler shifted laser light backscattered by particles in the atmosphere. It measures the absolute speed of wind and turbulences through laser pulses in all directions up to an altitude of 200 meters – i.e. higher than nacelle and blades of offshore wind turbines. The quality of the performed measurements will enable a very accurate estimation of the power production potential of the offshore wind project under development in Saint-Brieuc bay. A similar device was installed a few weeks ago close to the site of the offshore wind project developed by Nass&Wind Offshore off the coast of Pointe du Croisic (Guérande Bank project).

Collecting very precise data on wind gives Nass&Wind Offshore a competitive edge for the upcoming French tender for the construction and operation of offshore wind farms off the French coast. This is a trump card of much interest for the industrial and financial partners the company is in negotiations with for a common bid.

The measuring instrument was supplied by Leosphère (Orsay). Its supporting system was designed by Sobec (Brest). It will be installed by Iroise Mer (Plougonvelin) and a team from Nass&Wind Offshore, within the next three weeks depending on weather conditions. Installation will take three days.

As the Grand Léjon lighthouse is not connected to the grid, the LIDAR will be powered by four solar panels combined with a fuel cell, which will provide backup in case there is a lack of sunshine. This innovative configuration will be implemented for the first time. Installation of this type of device requires an investment of 200.000 Euros.

[mappress]

Source: nass-et-wind, October 15, 2010

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free