Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Framo Signs Contract with Total for the CLOV (Angola) Multiphase Pumping System
Business & Finance

November 19, 2010 · about 15 years ago

Framo Signs Contract with Total for the CLOV (Angola) Multiphase Pumping System

Framo Engineering AS and Total E&P Angola have recently signed a contract to supply a subsea Pumping System for the CLOV Development Project, located in the deepwater Block 17 offshore Angola. The contract between Total and Framo represents one of four main contracts placed by Total for this Project

2 minutes read
  • LinkedIn
  • X
  • Email

Framo Engineering AS and Total E&P Angola have recently signed a contract to supply a subsea Pumping System for the CLOV Development Project, located in the deepwater Block 17 offshore Angola.

The contract between Total and Framo represents one of four main contracts placed by Total for this Project. The contract period is 35 months and delivery shall take place in Angola in 2013. The contract includes the supply of a Suction Anchor, Subsea Pump Module (Framo FDS) with two Framo Hx pumps (multiphase), Umbilical System & topside Power & Control Module (PCM).

Managing Director of Framo Engineering AS, Ole G. Steine says, “This contract represents a major milestone for Framo as a System Supplier and is first of all viewed as a recognition of the significance of boosting for increased recovery/flow assurance, and also for the long track record of the Framo Subsea Pump technology and the recent work performed for Total’s Pazflor Project, also located in Block 17. Framo Engineering is very appreciative of Total’s, the Partner’s and Sonangol’s commitment to implement the multiphase technology for this important CLOV field development and to the Angolan territory”.

The CLOV development comprises the Cravo, Lirio, Orquidea and Violeta fields. A total of 34 subsea wells will be tied back to the CLOV FPSO unit, which has a processing capacity of 160,000 b/d and a storage capacity of 1.78 million barrels. The Framo FDS module will be located downstream four production manifolds for boosting the Miocene oil production back to the FPSO. Partners in CLOV are Total, Statoil, Esso and BP.

[mappress]

Source: Framo, November 19, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago