Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MEO Australia Provides Artemis-1 Progress Report
Business & Finance

December 1, 2010 · about 15 years ago

MEO Australia Provides Artemis-1 Progress Report

MEO Australia Limited advises that since the last progress report, Artemis-1 spudded at 00:45 hrs (Perth time) on Thursday 25th November. The 30” x 20” surface conductor was set in place and the 17-1/2” hole was drilled to 1,870m (below rotary table) at which depth the 13-3/8” intermediate casing ha

1 minutes read
  • LinkedIn
  • X
  • Email

MEO Australia Limited advises that since the last progress report, Artemis-1 spudded at 00:45 hrs (Perth time) on Thursday 25th November.

The 30” x 20” surface conductor was set in place and the 17-1/2” hole was drilled to 1,870m (below rotary table) at which depth the 13-3/8” intermediate casing has been run to a depth of 1,860m and successfully cemented in place.

Present operations include installing the Blow-Out-Preventer (BOP) and the marine riser followed by pressure testing all equipment prior to drilling the 12-1/4” hole.

It is anticipated that the 12-1/4” hole is likely to commence drilling on Friday 3rd December. The programmed drilling time to reach the top of the Calypso reservoir is approximately 2.5 days from commencement of drilling the 12-1/4” hole. In the event that gas shows are evident in the primary objective, a coring program is planned.

The next ASX release is planned for no later than Wednesday 8th December.

[mappress]

Source: MEO Australia ,December 1, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago