Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Beach Energy: Multi-Stage Fraccing Now Planned for Encounter-1 Gas Saturated Shale Interval (Australia)
Clean Fuel

December 23, 2010 · about 15 years ago

Beach Energy: Multi-Stage Fraccing Now Planned for Encounter-1 Gas Saturated Shale Interval (Australia)

Drilling and formation evaluation operations have been completed at Encounter-1, the first of a two well shale gas exploration program. The well has been cased and suspended for future fracture stimulation. Encounter-1 was drilled outside of structural closure and penetrated 393 metres of the target

2 minutes read
  • LinkedIn
  • X
  • Email

Drilling and formation evaluation operations have been completed at Encounter-1, the first of a two well shale gas exploration program. The well has been cased and suspended for future fracture stimulation.

Encounter-1 was drilled outside of structural closure and penetrated 393 metres of the target Roseneath-Epsilon- Murteree (REM) shale formations, which was significantly thicker than prognosed. Good gas shows were encountered throughout this section and initial log interpretation suggests continuous gas saturation with no evidence of water through and into the underlying Patchawarra Formation. This is a best case scenario for fracture stimulation as the thicker interval and absence of water reduce the risk of fracturing into zones that may produce formation brines.

A total of 5 cores were taken and analysis of these for gas content and mechanical properties has commenced. The results of these analyses will be used to estimate gas in place volumes and optimise design of the fracture stimulation program. Significantly, after being placed in canisters for transport, the shale cores were observed to be actively evolving gas.

Upon release from Encounter-1, the Ensign#16 rig will move to the Holdfast-1 location to drill the second well in the program. lt is expected that fracture stimulation of the two wells will commence in April.

Due to the increased thickness of the target section in Encounter-1, an I stage fracture stimulation program is now planned along the lines of the multi-stage fracturing techniques used in the prolific shale gas developments of the United States.

PEL218: Beach 90% (Operator), Adelaide Energy 10% .

[mappress]

Source: Beach Energy, December 23, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free