Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bounty Announces Progress Report on New Seaclem 1 Well Offshore Australia
Business & Finance

December 24, 2010 · about 15 years ago

Bounty Announces Progress Report on New Seaclem 1 Well Offshore Australia

Bounty Oil & Gas NL announces progress report on the New Seaclem 1 well in PEP 11, offshore NSW. MEC Resources investee company Advent Energy Ltd (Advent) has reported: Progress since Last Report The well was spudded at 00.00 hours AEDST 15 December 2010 and drilled the 9 7/8″ pilot hole to 310.5 me

2 minutes read
  • LinkedIn
  • X
  • Email

Bounty Oil & Gas NL announces progress report on the New Seaclem 1 well in PEP 11, offshore NSW. MEC Resources investee company Advent Energy Ltd (Advent) has reported:

Progress since Last Report

The well was spudded at 00.00 hours AEDST 15 December 2010 and drilled the 9 7/8″ pilot hole to 310.5 metres BRT.

Since the last report progress has been as follows:

– Run and cement 13 3/8″ casing to the intermediate casing point at 314 metres.

– Install BOP’s and subsea wellhead equipment.

– Drill ahead to the next casing point at approximately 346 metres

– Rig up and conduct wireline logging over the interval 314 to 346 metres. The logging instruments included “look ahead” seismic instruments intended to measure seismic waves for interpreting pore fluids beyond the present drilling depth.

– At 0600 on 24 December 2010 the well was at 346 metres.

Forward Operations:

Prepare to open (widen) the hole to 12 1/4″ and then run 9 5/8″ casing and cement in hole at approximately 346 metres BRT. Drill ahead to target zones.

The drilling schedule suggests drilling through the reservoir section will now occur on approximately Tuesday 28th December, 2010.

The well will evaluate any hydrocarbon bearing reservoirs with wireline logging tools. The drilling program does not incorporate flow testing or flaring of hydrocarbons. Upon conclusion of the drilling activity, the well will be plugged and abandoned as per the approved drilling program and best practice.

Bounty will release further details as soon as this information is available.

The well operator is Asset Energy Pty Limited a wholly owned subsidiary of Advent Energy Limited.

[mappress]

Source: Bounty Oil & Gas, December 24, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free