Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Turkmenistan: Dragon Oil Dzheitune Exploration Well Tested at Initial Combined Rate of 1,622 bopd
Business & Finance

January 12, 2011 · about 15 years ago

Turkmenistan: Dragon Oil Dzheitune Exploration Well Tested at Initial Combined Rate of 1,622 bopd

Dragon Oil plc , an international oil and gas exploration and production company, announces the completion and initial testing of the Dzheitune (Lam) B/150 development well. The Dzheitune (Lam) B/150 was drilled to a depth of 3,980 metres and completed as a dual producer by the Iran Khazar rig. The

1 minutes read
  • LinkedIn
  • X
  • Email

Dragon Oil plc , an international oil and gas exploration and production company, announces the completion and initial testing of the Dzheitune (Lam) B/150 development well.

The Dzheitune (Lam) B/150 was drilled to a depth of 3,980 metres and completed as a dual producer by the Iran Khazar rig. The combined initial test rate was 1,622 barrels of oil per day (“bopd”) with the short and long strings testing at 632 and 990 bopd,respectively. The Iran Khazar rig (image) has skidded to the next slot and spudded the Dzheitune (Lam) B/153 well.

Dr Abdul Jaleel Al Khalifa, Chief Executive Officer, commented:

“I am pleased to report that we have now fulfilled the 2010 drilling programme with the last of the 11 planned wells put into production in the first week of January this year.

“We have also met another significant objective for 2010 having completed and commissioned important new pipeline and processing infrastructure. As we gradually switch over to using the new 30-inch trunkline and associated in-field pipelines, we are already seeing improved average daily flow rates. With the integrated network of 30-inch trunkline, 14-, 18- and 20-inch in-field pipelines and the expanded Central Processing Facility, the infrastructure bottlenecks that constrained production growth have been completely removed.”

[mappress]

Source:Dragonoil, January 12, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago