Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Meyer Werft Receives LNG Carrier Order from Anthony Veder (Germany)
Project & Tenders

January 24, 2011 · about 15 years ago

Meyer Werft Receives LNG Carrier Order from Anthony Veder (Germany)

The Dutch shipping company Anthony Veder (Rotterdam) has ordered a new LNG carrier from MEYER WERFT. The new tanker for the transport of liquefied natural gas will have a length overall of abt. 156 m, a breadth of 22.70 m, and a cargo capacity of 15,600 cbm. This modern vessel which will be able to

2 minutes read
  • LinkedIn
  • X
  • Email

The Dutch shipping company Anthony Veder (Rotterdam) has ordered a new LNG carrier from MEYER WERFT. The new tanker for the transport of liquefied natural gas will have a length overall of abt. 156 m, a breadth of 22.70 m, and a cargo capacity of 15,600 cbm. This modern vessel which will be able to run on the low emission LNG fuel will be classed within the highest environmental norms.

The delivery of this new vessel is scheduled for the end of 2012. MEYER WERFT’s sister company, NEPTUN WERFT in Rostock-Warnemünde, will be highly involved in the construction and outfitting of this new LNG carrier. For the shipyard in the Baltic this order is very important to safeguard the workload for their staff up to 2012.

For Anthony Veder this is the second small-scale LNG carrier. This new vessel has double the capacity than the Coral Methane. MEYER WERFT and Anthony Veder Group have already worked together since the mid of the 1970s. “We are excited about our next step in LNG with this innovative ship, the first of this type. It fits our goal to further develop this market of distributing environmental friendly energy.” says Jan Valkier, Managing Director of Anthony Veder.

Thanks to this new order MEYER WERFT, which has already built 55 LPG- and LEG carriers, is now entering the market of building LNG carriers. The Papenburg-based shipyard’s focus is on mid-scale ships of this type. “We see that the smaller-scale LNG market has a great future,” says Bernard Meyer, Managing Partner of MEYER WERFT.

[mappress]

Source: Meyer Werft, January 24, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

13 days ago