Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Statoil: Responsible Operation at Gullfaks field, Offshore Norway
Business & Finance

January 30, 2011 · about 15 years ago

Statoil: Responsible Operation at Gullfaks field, Offshore Norway

Statoil held a follow-up meeting with the Petroleum Safety Authority Norway (PSA) in which they reviewed the status after the C06 incident at Gullfaks. “We addressed two topics in the meeting, specifically those relating to well integrity and pressure build-up in the Shetland formation,” says head o

2 minutes read
  • LinkedIn
  • X
  • Email

Statoil held a follow-up meeting with the Petroleum Safety Authority Norway (PSA) in which they reviewed the status after the C06 incident at Gullfaks.

“We addressed two topics in the meeting, specifically those relating to well integrity and pressure build-up in the Shetland formation,” says head of Gullfaks, Gunnar Nakken.

“Studies carried out in 2010 show that the pressure in the Shetland layer is sufficiently high that the formation strength alone does not constitute a full barrier against leakage to the sea bed. However, in our view, the sands in the Hordaland formation, which lie above the Shetland and Lista formations, have sufficient capacity to compensate for this. We do not therefore consider it probable that leaks will occur to the formations above the Hordaland layer,” he says.

“During the autumn of 2010 we have closed down 20 wells, mainly water injection wells, after a review of the integrity of all the wells in the field. As a consequence of reduced water injection (pressure support), a further 30 wells were closed down in 2010 to maintain the pressure balance in the field. We are now continuing to work systematically to get as many as possible of these wells into production again,” says Nakken.

“Statoil believes that our operations at Gullfaks are safe and responsible. Wells with problems relating to their integrity have been closed down. We are monitoring the pressure in all wells at the field in order to continually confirm our evaluations and conclusions,” he says.

“We are keeping the PSA, the Norwegian Petroleum Directorate, partners, employee representatives and the safety organisation updated on developments at Gullfaks, so that they are reassured that we have responsible and safe operations at the field at all times.”

Chief health and safety representative Terje Herland at Gullfaks has been involved in the preceding process and also during earlier evaluations of Shetland.

“I consider the situation now to be better and I am not concerned for the safety of personnel at the field,” says Herland.

[mappress]

Source: Statoil, January 31, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago