Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›UK: Seajacks Provides Construction Update on New Jack-ups
Fossil Energy

February 4, 2011 · about 15 years ago

UK: Seajacks Provides Construction Update on New Jack-ups

In February 2010 Seajacks entered into a contract with GustoMSC to provide the Basic Design Package for two purpose built wind farm installation vessels. In June 2010 Seajacks entered into a contract with Lamprell shipyard to build these new vessels and Seajacks will take delivery of the first new-b

2 minutes read
  • LinkedIn
  • X
  • Email

In February 2010 Seajacks entered into a contract with GustoMSC to provide the Basic Design Package for two purpose built wind farm installation vessels.

In June 2010 Seajacks entered into a contract with Lamprell shipyard to build these new vessels and Seajacks will take delivery of the first new-build, Seajacks Zaratan, in May 2012, and the additional new-build shortly thereafter.

These self-propelled jack-ups have been designed specifically to service the wind farm installation market in the harsh operating environment of the North Sea, as well as to provide services to the oil and gas industry . The vessels will be a modified version of the MSC NG5500 design, which incorporates a fully redundant DP2 propulsion system, accommodations for 90 persons, and an 800T leg encircling crane designed by MSC.

Seajacks Zaratan Construction Summary – 03/02/2011

* Double Bottom sections 5, 6, 7 & 8 are fully assembled together on the Keel blocks

* Double Bottom section 9 has been fully assembled and lifted into position on the Keel blocks to be welded to section 8

* Double Bottom section 10 is under fabrication & assembly

* Wing Tank sections 17 & 18 panels are under fabrication

* Main Deck forward section 30 steel profiles are being cut

* Pipe supports & spool fabrication, galvanizing & assembly continues for the Bilge, Ballast, Sea Water Cooling, Potable Fresh Water Storage, Sanitary, Drains, Vents & Sounding pipe systems located within double bottom sections 5, 6, 7, 8, & 9

* Spud Can fabrication is in progress at the sub-contractor’s facility

– Bottom plates & internal bulkheads are under fabrication

– Lower pillars are being rolled into shape

* Leg materials have been delivered to the sub-contractor & construction is expected to start on schedule

* Main Crane materials have been delivered to the sub-contractor & construction has started on schedule

* Main Electrical Switchboards construction & assembly continue according to the schedule

* Construction of the hull structure is currently progressing ahead of schedule.

[mappress]

Source:Seajacks, February 4, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free