Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›China: GN Brand Presents Dredging Slurry Separation System
Equipment

February 7, 2011 · about 15 years ago

China: GN Brand Presents Dredging Slurry Separation System

The GN 300 GPM dredging slurry separation system has been designed specifically to accept feed directly from the dreding at a maximum rate 300M3 per hour, GN dredging slurry Separation system equipments: 1. GNZS83-3 Linear motion slurry separation shale shaker. 2 sets 2. GNZJ83-3 slurry separation d

2 minutes read
  • LinkedIn
  • X
  • Email

The GN 300 GPM dredging slurry separation system has been designed specifically to accept feed directly from the dreding at a maximum rate 300M3 per hour, GN dredging slurry Separation system equipments:

1. GNZS83-3 Linear motion slurry separation shale shaker. 2 sets

2. GNZJ83-3 slurry separation desander

3. GNZJ83-3 slurry separation Desilter.

Dredging Slurry Separation System Working Process

The dredged slurry enters the Slurry separation system directly from the dredge.

In the first phase the slurry passes over scalping shale shakers to remove debris and larger particles. The debris can include: grass, roots, leaves, cans, plastic, rags and bottles. Solids Size≥0.41mm will be removed from the fluids.

The slurry with solids size≤0.41mm, with the above debris removed drops into an isolated section of the tank where it is picked up by a centrifugal pump.

This pump moves the slurry to the second phase, which is the De-sanding phase.

Here the slurry is pumped through the de-sanding Hydro-cyclones, which removes the solids above the 75 micron size.

The overflow from these hydro-cyclones drops into a second isolated tank section, while the underflow is deposited onto vibrating screens for drying of the solids.

The slurry, which now has solids removed above 75 microns is picked up from this tank section by a second centrifugal pump and pumped through a bank of de-silting hydro-cyclones to remove the solids passed by the de-sanding hydro-cyclones. This phase removes solids down to the 25 micron size. Again the overflow from the de-silting hydrocyclones drops into the third tank section, while the under flow is deposited onto vibrating screens for drying.

The now “cleaned” fluid is picked up by the third centrifugal pump to be transported to a point designated by the client.

If want to separate fine particle, the next stage can use centrifuge.

[mappress]

Source: gn-shale-shaker, February 7, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free