Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Norway: Shell Wants AGR Technology for Ormen Project
Equipment

February 15, 2011 · about 15 years ago

Norway: Shell Wants AGR Technology for Ormen Project

Norske Shell AS has signed a letter of intent with AGR Drilling Services for a contract worth NOK84m (£9m). AGR Drilling Services’ excavation and trenching technology has been chosen by Shell for the next phase of its extension project in the northern part of the Ormen Lange field. Four new engineer

2 minutes read
  • LinkedIn
  • X
  • Email

Norske Shell AS has signed a letter of intent with AGR Drilling Services for a contract worth NOK84m (£9m). AGR Drilling Services’ excavation and trenching technology has been chosen by Shell for the next phase of its extension project in the northern part of the Ormen Lange field. Four new engineering positions have been created at AGR DS in Aberdeen as a result.

The work will involve seabed levelling and pre-lay trenching in the stiff soils of Europe’s third-largest gas field. The ClayCutter X™ (example pictured) from AGR DS will be used on the project. John Sands, Vice President Trenching and Excavation, said: “We are delighted to have been selected by Shell to work with them on the next phase of seabed intervention on the Ormen Lange field.

‘Confidence’

“This new contract reflects Shell’s confidence in both our unique ClayCutter X™ technology and the highly experienced AGR team.”

AGR DS will start the offshore phase of the project in May. This is expected to take one month but there are options to increase the scope.

The ClayCutter X™ is perfect for levelling and trenching in the challenging soil conditions found on the Ormen Lange field. It has a powerful, seawater jetting system, plus three operating modes which can be selected using an ROV. This enables AGR’s experienced operators to choose the right mode for the task in hand – whether it’s general trench excavation, trench widening or excavation in very hard soils.

The system has previously been used with great success at 870m depth (2,854ft) on Ormen Lange’s Southern field development.

[mappress]

Source: agr, February 15, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

12 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

12 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

14 days ago