Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Eni Moves Saipem 10000 Drillship Back to Gawain-1 Well, Offshore Australia
Business & Finance

February 24, 2011 · about 15 years ago

Eni Moves Saipem 10000 Drillship Back to Gawain-1 Well, Offshore Australia

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit,WA-362-P. that at 09:00 hours WST (Western Standard Time) on Wednesday, 23 February 2011, the Saipem 10000 drillship was returning to the well location after moving a

1 minutes read
  • LinkedIn
  • X
  • Email

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit,WA-362-P. that at 09:00 hours WST (Western Standard Time) on Wednesday, 23 February 2011, the Saipem 10000 drillship was returning to the well location after moving away due to the proximity of Tropical Cyclone Carlos.

Since the last progress report of 14 February 2011:

• the 24″ hole section has been drilled;

• the 20″ conductor run and cemented in place; and

• the 87a” pilot hole drilled to 2,540m MDRT (measured depth below rotary table). Several days were lost as a result of having to wait on weather.

Planned operations over the next week are to open up the 87/ pilot hole to a 177a” hole to the current 2.540m MDRT depth and then run and cement in the 133/a” intermediate casing prior to the Marine Riser and Blow-out-Preventer (BOP) being installed and pressure tested.

The Gawain-1 well is being drilled by the Saipem 10000 drillship and is the first well in a two well programme. It will be immediately followed by the Galahad-1 well in WA-363-P.

The next ASX release is planned for Wednesday. 2 March.

The participants in the WA-362-P and WA-363-P Joint Ventures are:

Eni Australia Limited 40%

OMV Australia Pty Ltd 40%

Octanex Group 20%

[mappress]

Source:Octanex, February 24, 2011;Image: Laohamutuk

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago