Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Statoil Picks Up Pace Towards Realizing Fast Track Field Developments Offshore Norway
Subsea

February 25, 2011 · about 15 years ago

Statoil Picks Up Pace Towards Realizing Fast Track Field Developments Offshore Norway

A contract signed recently with Technip for marine operations and pipelay on the Gygrid field development in the Norwegian Sea is proof. “This agreement moves us one step closer to realising Gygrid, planned to start during 2Q 2011 and begin producing as soon as late 2012/early 2013,” says Halfdan Kn

2 minutes read
  • LinkedIn
  • X
  • Email

A contract signed recently with Technip for marine operations and pipelay on the Gygrid field development in the Norwegian Sea is proof.

“ This agreement moves us one step closer to realising Gygrid, planned to start during 2Q 2011 and begin producing as soon as late 2012/early 2013 ,” says Halfdan Knudsen , vice president project management, Development and production Norway.

“ 2011 marks the year that our fast-track concept becomes reality – and Gygrid demonstrates our ability to deliver! ”

Gygrid (Halten area) is one of four fast-track projects launched by Statoil last year.

The others are Visund South, Katla (Oseberg area) and Vigdis North-east (Tampen area). Five additional fast-track projects are set to get underway this year and next.

The Gygrid award is valued at approximately €90 million (NOK 702 million).

Contract content

The contract with Technip includes fabrication and installation of a 19.5 kilometre pipe-in-pipe production flowline, plastic-lined water-injection flowline and gas-lift flowline of the same length.

The marine operations include structure installation, tie-ins and installation of new risers and umbilicals connecting Gygrid to the existing Njord A platform.

Installation work will be performed by the vessel, Apache II, in summer 2012.

The Gygrid field is located in the Norwegian Sea approximately 20 kilometres northeast of the Njord field at a water depth of 250 metres. Gygrid will consist of a four-slot template tied back to the Njord A semi-submersible production platform.

The contract is subject to approval of the plan for development and operation (PDO) of Gygrid by the Norwegian authorities.

[mappress]

Source: statoil ,February 25, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free