Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Eni Restarts Operations at Gawain-1 Well, Offshore Western Australia
Business & Finance

March 3, 2011 · about 15 years ago

Eni Restarts Operations at Gawain-1 Well, Offshore Western Australia

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 07:00 hours WST (Western Standard Time) on Wednesday, 2 March 2011, the Saipem 10000 drillship had re-commenced operations after having to wait on

2 minutes read
  • LinkedIn
  • X
  • Email

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 07:00 hours WST (Western Standard Time) on Wednesday, 2 March 2011, the Saipem 10000 drillship had re-commenced operations after having to wait on weather due to the proximity of a tropical low.

Since the last progress report of 23 February 2011, the 81/2″ pilot hole, that had already been drilled to 2,540m MDRT (measured depth below rotary table), was opened up to a 171/4″ hole and the 13%” intermediate casing then run and cemented in place. Several days were again lost over the last week as a result of having to wait on weather.

Planned operations over the next week are to run, install and pressure test the Marine Riser and Blow- out-Preventer (BOP) prior to drilling ahead in the 12%” hole to approximately 3,500m MDRT. The 12Vi” hole is planned to intersect the Triassic reservoir in the top of the Mungaroo Formation at approximately 2,599m MDRT. The Mungaroo Formation is the target formation for the well, with mapped closures at the top of the Formation and at 3,832m MDRT. A positive outcome at the 3,832m MDRT target may lead to deepening the well.

A Time vs Depth Curve’ for the Gawain-1 well is shown in the attached figure. The Gawain-1 well is being drilled by the Saipem 10000 drillship and is the first well in a two well programme. It will be immediately followed by the Galahad-1 well in WA-363-P.

Depending upon the progress of the well, the next ASX release is planned for Wednesday, 9 March.

The participants in the WA-362-P and WA-363-P Joint Ventures are:

Eni Australia Limited 40%

OMV Australia Pty Ltd 40%

Octanex Group 20%

[mappress]

Source:Octanex, March 3, 2011; Image:Laohamutuk

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago