Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Octanex Provides Update on Gawain-1 Prospect Drilling
Business & Finance

March 14, 2011 · about 15 years ago

Australia: Octanex Provides Update on Gawain-1 Prospect Drilling

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 24:00 hours WST (Western Standard Time) on Sunday, 13 March 2011, the well was at a depth of 3,208m MDRT and drilling ahead in the 121/4″ hole. Sin

2 minutes read
  • LinkedIn
  • X
  • Email

Octanex N.L. has been advised by Eni Australia Limited, the Operator of the Gawain-1 well located in the outer Exmouth Plateau permit, WA-362-P, that at 24:00 hours WST (Western Standard Time) on Sunday, 13 March 2011, the well was at a depth of 3,208m MDRT and drilling ahead in the 121/4″ hole.

Since the last progress report of 9 March 2011, the hole was conditioned prior to continuing in the 12%” hole to the current depth.

The Mungaroo Formation is the target formation for the well, with mapped closures at the top of the Formation and at 3,832m MDRT. A positive outcome at the 3,832m MDRT target may lead to deepening the well.

The results to date from drilling the 12%” section have been as follows:

• The well intersected the top sandstone in the Triassic Mungaroo Formation at approximately 2,693m MDRT; being 94 metres deep to prognosis;

• The top Triassic Mungaroo Formation sandstone was intersected without gas or hydrocarbon shows;

• Hydrocarbon fluorescence has been observed in three thin sandstones, but without any significant gas being recorded.

Until a complete suite of wireline logs has been run over the 12%” section, the significance of the hydrocarbon fluorescence cannot be determined. The well programme is to continue drilling the 12%” hole to approximately 3,500m MDRT before running the logging suite. The 9%” casing will then be run and cemented in before drilling the 8’/2n hole to the well’s total depth of 4,025m MDRT.

The Gawain-1 well is being drilled by the Saipem 10000 drillship and is the first well in a two well programme. It will be immediately followed by the Galahad-1 well in WA-363-P. The participants in the WA-362-P and WA-363-P Joint Ventures are:

Eni Australia Limited 40%

OMV Australia Pty Ltd 40%

Octanex Group 20%

[mappress]

Source: OCTANEX, March 14, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago