Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Alto Group to Prepare Nessie N8DX CHD for Bogue River Dredging Project
Vessels

March 16, 2011 · about 15 years ago

Alto Group to Prepare Nessie N8DX CHD for Bogue River Dredging Project

Alto Group Holdings, Inc., an innovative mining and commodities trade company headquartered in New York, announces its newly purchased Nessie N8DX cutter head dredge is being transported for servicing to prepare for the anticipated production planned on Bogue River Dredge Concession in Mali, West Af

2 minutes read
  • LinkedIn
  • X
  • Email

Alto Group Holdings, Inc., an innovative mining and commodities trade company headquartered in New York, announces its newly purchased Nessie N8DX cutter head dredge is being transported for servicing to prepare for the anticipated production planned on Bogue River Dredge Concession in Mali, West Africa.

The Mali operations team has put together the local logistics groups needed to move this newly purchased N8DX cutter head dredge to a caterpillar certified servicing company located in Bamako Mali, West Africa. The dredge is being removed from a very remote location called Diabia which will require several days of driving in order to facilitate the relocation properly. Once this equipment arrives a complete tune up will begin to replace all hoses, belts and hydraulic fluid as the first step to position this cutter head dredge to begin commercial operation.

Management has reported that the N8DX dredge is in good condition with all major operating systems currently fully functional. The remaining processing equipment required to produce commercially will be gold recovery separation circuit. This circuit will be manufactured within the United States, shipped on location and positioned on a platform barge directly behind the dredge which will be delivering the gold bearing material to the separation circuit. This type of system has been planned order to maintain the shortest distance for the slurried material to travel during production and will allow all excess sand and gravel to be ejected behind the recovery unit. This streamlined processing will increase the efficiency of the production output planned and allow for the highest possible profit margins while maintaining minimum reclamation issues within local water ways and delicate ecosystems.

[mappress]

Source: marketwire, March 16, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

12 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

12 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

12 days ago