Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›ABS Says The Time Is Now for FLNG Concept (The Netherlands)
Clean Fuel

March 24, 2011 · about 15 years ago

ABS Says The Time Is Now for FLNG Concept (The Netherlands)

ABS Vice President of Global Gas William J. Sember (image) says the classification society is in advanced stages of design review for a number of Floating LNG (FLNG) concepts, as this technology moves ever closer to reality. Speaking at the Gastech 2011 conference, where he chaired the technical ses

2 minutes read
  • LinkedIn
  • X
  • Email

ABS Vice President of Global Gas William J. Sember (image) says the classification society is in advanced stages of design review for a number of Floating LNG (FLNG) concepts, as this technology moves ever closer to reality .

Speaking at the Gastech 2011 conference, where he chaired the technical session on FLNG terminals and systems, Sember noted that as recently as five years ago, floating solutions for the import and export of LNG were still considered new and novel concepts.

“ Today emerging proprietary technologies and transport designs have come of age and industry is poised for the first projects. With more than one-third of global gas reserves stranded by their location or field size without commercially viable access to world markets the attractiveness of FLNG cannot be denied ,” he told attendees.

Major projects in progress include Shell’s Prelude field in the Browse Basin off Western Australia, which gained environmental approval in late 2010 and has a target production start date of 2016. Also being closely followed are several projects offshore Papua New Guinea and Inpex’s Abadi Field gas project offshore Indonesia.

FLNG offers a number of advantages over land-based terminals. FLNG installations can result in lower overall project costs and reduced environmental footprint because facilities such as long pipelines to shore, onshore development and offshore compression platforms are not needed. With gas deposits often in remote or stranded areas far from the coast the ‘marinizing’ of production, liquefaction and export facilities offers great potential for many future development projects.

Sember noted that the shipping and offshore industries have spent the past five years successfully advancing both the technology and commercial attractiveness of the FLNG concept as a means of delivering new sources of cleaner energy.

Technology developments have addressed issues as the integration of subsea architecture with FLNG; offloading systems, in particular for harsher environments with tandem configurations based on cryogenic hoses or flexible pipes; and the qualification and testing of components with regard to LNG transfer systems.

“ From a class society perspective there are no technology showstoppers for FLNG. Liquefaction plants have been suitably optimized in order to efficiently use deck space while taking into account the safe and efficient operation of process equipment ,” said Sember. “ The advances and level of sophistication in all these subjects are evident. The time for commercialization and the first project is now. ”

[mappress]

Source: ABS, March 24, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free