Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›MIS to Fabricate Four Legs for Wind Turbine Installation Jack-Up Crane Vessel (UAE)
Offshore Wind

March 29, 2011 · about 15 years ago

MIS to Fabricate Four Legs for Wind Turbine Installation Jack-Up Crane Vessel (UAE)

UAE-based MIS Group, a diversified engineering and contracting group focused on the energy sector, has signed a contract with Polish shipbuilding yard CRIST S.A. The contract, valued at US$ 22.5 million, entails the fabrication of four Friede & Goldman (F&G) legs for the wind turbine installation he

2 minutes read
  • LinkedIn
  • X
  • Email

UAE-based MIS Group, a diversified engineering and contracting group focused on the energy sector, has signed a contract with Polish shipbuilding yard CRIST S.A. The contract, valued at US$ 22.5 million, entails the fabrication of four Friede & Goldman (F&G) legs for the wind turbine installation heavy lift jack-up crane vessel, Rig NB 142, for end user BELUGA HOCHTIEF Offshore, a joint venture between two German companies.

MIS established its new build credentials on F&G designed Super M2 offshore jack up drilling rigs of which the company has already delivered four, all contracted and operational. It will shortly deliver its fifth rig, Hull 110 to its client MENAdrill. This contract sees MIS building on that expertise with the construction of the four 447-foot legs for CRIST. The legs will be fabricated at MIS’ yard in Sharjah and are very similar to the F&G JU2000E legs which MIS plans to build in the future.

“This contract is valuable to MIS on two fronts; it sees us entering the wind installation vessel market, an area that MIS has targeted while maintaining its focus on the jack-up drilling rig market, and it marks the start of a new relationship with a well-established European yard,” said Kevin Hudson, MIS Managing Director. “We hope this project is the beginning of a successful, long-term relationship.”

Mr. Karsten Dan Andersen, BELUGA HOCHTIEF Offshore’s Project Director , commented, “We are pleased that this contract has been placed with the MIS Group given their expertise on F&G new build jack-up vessels. With the current delivery date for the jack-up crane vessel set for Q2 2012, the signing of this contract marks a critical milestone to start the project and to have it delivered to meet the big demand in this booming market.”

[mappress]

Source: miscoltd, March 29, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free