Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›France: Elengy Pursues Plans to Renovate Fos Tonkin LNG
Clean Fuel

April 5, 2011 · about 15 years ago

France: Elengy Pursues Plans to Renovate Fos Tonkin LNG

Following a public debate held from September 6 to December 17 2010 by the National Commission for Public Debate (CNDP), Elengy has decided to pursue its studies into extending the operation of the Fos Tonkin LNG terminal past 2014, for 20 years, with a maximum natural gas send-out capacity of 7 bil

2 minutes read
  • LinkedIn
  • X
  • Email

Following a public debate held from September 6 to December 17 2010 by the National Commission for Public Debate (CNDP), Elengy has decided to pursue its studies into extending the operation of the Fos Tonkin LNG terminal past 2014, for 20 years, with a maximum natural gas send-out capacity of 7 billion m3/year.

These studies, enriched by the debate, will make it possible to specify the size of the new LNG tank that will replace two of the three current tanks with a maximum capacity of 160,000 m3, and to choose between renovating the jetty or building a new one for berthing and unloading LNG carriers. The results will be presented to the regional stakeholders in connection with a Local Information and Dialogue Committee meeting that Elengy decided to set up in connection with its consultative approach.

Elengy will – at the same time and in a transparent and non-discriminatory way – continue its open season for regasification capacities at the Fos Tonkin terminal. The process will take place from April to November 2011. Subject to the project’s economic and commercial feasibility and the securing of the necessary administrative authorisations, the new equipment will be gradually commissioned between 2015 and 2017.

Located along the Mediterranean coast 50 km west of Marseille, the Fos Tonkin terminal can accommodate LNG carriers 24 hours a day transporting up to 75,000 cu.m of LNG, a size adapted to Mediterranean traffic. The terminal was commissioned in 1972 and in 2010 received 128 cargoes, accounting for nearly 15% of French consumption.

[mappress]

Source: Elengy, April 5, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free