Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Australia: Beach Energy Completes Holdfast 1 Shale Gas Drilling
Clean Fuel

April 6, 2011 · about 15 years ago

Australia: Beach Energy Completes Holdfast 1 Shale Gas Drilling

Beach Energy Limited has successfully completed drilling and evaluation of the Holdfast-1 shale gas well, with production casing to follow. This well is the second of Beach’s two well shale evaluation program targeting the Roseneath-Epsilon-Murteree (REM) shale sequence in PEL 218 in the Cooper Basi

2 minutes read
  • LinkedIn
  • X
  • Email

Beach Energy Limited has successfully completed drilling and evaluation of the Holdfast-1 shale gas well, with production casing to follow. This well is the second of Beach’s two well shale evaluation program targeting the Roseneath-Epsilon-Murteree (REM) shale sequence in PEL 218 in the Cooper Basin.

Extensive coring was undertaken at Holdfast-1 with over 350 metres of the target shale sequence and adjacent strata recovered. Analysis of the Holdfast-1 core will commence immediately. A thorough evaluation is currently being undertaken on core from the Encounter-1 well, which intersected a thicker sequence of shale than initially prognosed.

The thickness of the REM target section at Holdfast-1 is in line with pre-drill estimates and confirms that the REM sequence thickens off structure. The REM section as well as the tight sands of the Daralingie and Patchawarra (outside structural closure) are interpreted to be gas saturated. At Encounter-1, the sandstones of the Toolachee formation (also outside structural closure) have been interpreted as gas saturated and as a result will also be evaluated at Holdfast-1. These tight sands outside of sturctural closure potentially add to the resource in PEL 218.

In mid May, Encounter-1 and Holdfast-1 are scheduled to be fracture stimulated with up to eight fraccing intervals planned. These wells will then be flow tested, the information from which, along with the analysis of the core from both wells, will likely result in a resource addition for both wells in Q3 2010.

[mappress]

Source: Beach Energy, April 6, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free