Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›SMart Wind Installs First Met Mast at 4GW Hornsea Zone this Summer (UK)
Business & Finance

April 20, 2011 · about 15 years ago

SMart Wind Installs First Met Mast at 4GW Hornsea Zone this Summer (UK)

The SMart Wind consortium, led by Mainstream Renewable Power and Siemens Project Ventures, today announced the signing of contracts to install the first met mast at its 4,000MW Hornsea zone. The mast, which is due to be installed in August, will use the new “twisted jacket” foundation, designed by K

2 minutes read
  • LinkedIn
  • X
  • Email

The SMart Wind consortium, led by Mainstream Renewable Power and Siemens Project Ventures, today announced the signing of contracts to install the first met mast at its 4,000MW Hornsea zone. The mast, which is due to be installed in August, will use the new “twisted jacket” foundation, designed by Keystone Engineering.

This novel foundation design, funded in partnership with the Carbon Trust and DONG Energy, aims to significantly reduce foundation CAPEX costs.

The project received grid connection for the first 1,000MW in September 2010 and over the past twelve months has been undergoing a full spectrum of environmental surveys, bird and mammal observations, geophysics, geotechnical investigation, marine ecology and deployment of metocean measuring devices to record wind and waves.

Andy Kinsella, Chairman of SMart Wind commented: “We are delighted to be installing our first met mast at Hornsea. This is another significant milestone on the path to delivering our first project into construction by 2014. Reducing the Cost of Energy is a key focus for SMart Wind and by using the new “twisted jacket” foundation we are clearly demonstrating our commitment to real cost reductions and innovation”.

The “twisted jacket” prototype is one of four finalists from the Carbon Trust’s Offshore Wind Accelerator (OWA) foundations competition to find the most innovative and cost effective turbine foundation designs for deeper water conditions. Hochtief Solutions AG is the lead EPCI contractor for the installation of the met mast. Under a separate agreement, University College Dublin with support from Enterprise Ireland and Fugro Structural Monitoring Limited will install structural instrumentation on the foundation to help further develop the ‘Twisted Jacket’ designs and give confidence in terms of performance.

The OWA is a collaborative RD&D programme between the Carbon Trust, DONG Energy, E.ON, Mainstream Renewable Power, RWE Innogy, Scottish Power Renewables, SSE Renewables, Statkraft and Statoil that aims to reduce the cost of offshore wind by 10%.

( smartwind )

[mappress]

Source: smartwind, April 20, 2011; Image: keystoneengr

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago