Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Santos to Use Stena Clyde Rig for Drilling of Finucane South-1 Exploration Well
Business & Finance

April 21, 2011 · about 15 years ago

Australia: Santos to Use Stena Clyde Rig for Drilling of Finucane South-1 Exploration Well

Tap Oil Limited announced that Santos, the operator of the WA-191-P joint venture, has advised that the Finucane South-1 exploration well will be drilled using the Stena Clyde semi-submersible drilling rig immediately following the conclusion of rig operations on the Zola-1 well (WA-290-P). The Finu

2 minutes read
  • LinkedIn
  • X
  • Email

Tap Oil Limited announced that Santos, the operator of the WA-191-P joint venture, has advised that the Finucane South-1 exploration well will be drilled using the Stena Clyde semi-submersible drilling rig immediately following the conclusion of rig operations on the Zola-1 well (WA-290-P).

The Finucane South prospect is located at the northern end of the Carnarvon Basin, approximately 15km east of the Mutineer facility. Finucane South-1 will be drilled to potentially supplement the discovered resources contained in the adjacent Fletcher Field. Tap estimates the Finucane South prospect has a potential gross mean recoverable oil volume of 8 million barrels.

Finucane South is a moderate-sized structural closure mapped at the base of the Cretaceous regional seal. The underlying Late Jurassic Angel Formation primary target will be intersected at approximately 2,960m below sea level. Water depth at the well location is approximately 140m. Finucane South-1 will be drilled 2km SSW of the Finucane-1 well (1978) which intersected oil shows at the top of the Angel Formation despite having been drilled off structure.

Based on Finucane South-1’s proximity to other wells in the area (notably Finucane-1 and the Fletcher oil wells) plus its coverage by reprocessed 3D seismic, the risk attached with drilling can be categorised as low-moderate.

Finucane South-1 is expected to commence within a week and is planned to take approximately 20-25 days to reach a final total depth of around 3,500 metres. Weekly updates will be provided during drilling operations.

Tap Comment

Tap’s Managing Director and CEO, Troy Hayden , said:

“We are pleased to be able to follow the successful Zola-1 discovery well with another well in the highly productive Carnarvon Basin.

Although Finucane South is a relatively modest structure, it is targeting oil rather than gas, being close to the previous Fletcher oil discovery in the same permit. There are several development and monetisation options available in a success case.”

[mappress]

Source:Tap Oil , April 21,2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago