Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ocean Rig Orders Two More Drillships at SHI, South Korea
Business & Finance

May 6, 2011 · about 15 years ago

Ocean Rig Orders Two More Drillships at SHI, South Korea

Ocean Rig has recently ordered two more drill ships for construction at the Samsung Heavy Industries shipyard in Korea. The drill ships are scheduled for delivery in July and October 2013. Ocean Rig’s drillships are based upon the Saipem 10K design. They are a successful and well proven design compl

1 minutes read
  • LinkedIn
  • X
  • Email

Ocean Rig has recently ordered two more drill ships for construction at the Samsung Heavy Industries shipyard in Korea. The drill ships are scheduled for delivery in July and October 2013.

Ocean Rig’s drillships are based upon the Saipem 10K design. They are a successful and well proven design complete with full dual derrick enhancements to ensure optimal operational efficiency. The first vessel was delivered to Ocean Rig on 3 January 2011 and the other two vessels are scheduled for delivery 29 July and 30 September 2011.

Main Features: • Water depth capacity of 10,000 feet • Variable deck load of 20,000 tonnes • Transit speed of 12 knots • Dynamic positioning system – Kongsberg DP Class 3 • Vessel power of 6 x 8,000 KW STX diesel engines • Thruster capacity 6 x 5,500 KW • Dual drilling package to enable drilling operations in Main & Aux well • Five (5) x 14-P-220 HP Mud Pumps

The Company yesterday announced that Ocean Corcovado Drillship commenced its voyage from Peterhead to Greenland. The drillship has been successfully prepared for the Greenland Campaign, including installation of Cairn 3rd party equipment bunkering for drilling of three wells. The ship is expected to arrive at the well-site in about 7 days.

[mappress]

Source:Ocean Rig , May 6, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago