Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Cromarty Firth Port Hosts Fabrication and Assembly of New Power Device (UK)
Offshore Wind

May 10, 2011 · about 15 years ago

Cromarty Firth Port Hosts Fabrication and Assembly of New Power Device (UK)

The Invergordon Service Base has played host to the fabrication and assembly of the next generation wave power device. The Powerbuoy ®, PB150, is the largest and most powerful designed to date by Ocean Power Technologies (OPT) and with a peak rated power output of 150KW, would produce enough energy

2 minutes read
  • LinkedIn
  • X
  • Email

The Invergordon Service Base has played host to the fabrication and assembly of the next generation wave power device.

The Powerbuoy ®, PB150, is the largest and most powerful designed to date by Ocean Power Technologies (OPT) and with a peak rated power output of 150KW, would produce enough energy to supply 150 homes.

The Powerbuoy departed the Port on Thursday 14th April, headed for its temporary ocean home, where trials have commenced. The device is designed for utility-scale wave energy farms worldwide and the tempestuous waters off the Scottish coast make an ideal testing ground.

Chief Executive and Harbour Master for the Cromarty Firth Port Authority (CFPA), Captain Ken Gray , said “We are delighted that OPT chose the Invergordon Service Base and local, highly skilled companies for the build and assembly of the Powerbuoy. We are well established in the onshore wind sector, but the fabrication and assembly of the Powerbuoy at Invergordon supports our aim of developing the Port into a renewable energy centre.”

CFPA has already provided full assembly and installation support to the two 5MW Beatrice test wind turbines. Furthermore, the Aquamarine’s test Oyster wave energy converter was fabricated at Invergordon.

For many years, the Invergordon Service Base has been recognised worldwide as a hub for Inspection, Repair and Maintenance of oil rigs and subsea engineering, however the growth of the marine renewable industry has seen the Base become a major service facility for the renewables industry, having already handled over 150 complete onshore wind turbines.

( cfpa )

[mappress]

Source: cfpa, May 10, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free