Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazil: Petrobras, Jogmec to Conduct Feasibilty Study on Flexible Pipe Design for Pre-Salt Cluster
Fossil Energy

May 12, 2011 · about 15 years ago

Brazil: Petrobras, Jogmec to Conduct Feasibilty Study on Flexible Pipe Design for Pre-Salt Cluster

Petrobras has signed a Specific Agreement with Jogmec – Japan Oil, Gas, and Metals National Corporation, with the aim of commencing a technical feasibility study on flexible pipes for oil production in the pre-salt cluster. This study is the second collaboration between the two companies. The relati

1 minutes read
  • LinkedIn
  • X
  • Email

Petrobras has signed a Specific Agreement with Jogmec – Japan Oil, Gas, and Metals National Corporation, with the aim of commencing a technical feasibility study on flexible pipes for oil production in the pre-salt cluster.

This study is the second collaboration between the two companies. The relationship between Petrobras and Jogmec began in December 2005, when they signed a memorandum of understanding for collaboration on activities of mutual interest related to oil and gas exploration and production, health, safety and environment, and sector-related research and development projects. They first joined forces on research projects in 2006, working on Mono-column (cylindrical) Floating Production, Storage, and Offloading (FPSO) systems. The studies have been completed successfully and show promising results.

The technical feasibility study will be carried out by a Japanese consortium which will include Furukawa Electric Co. Ltd. Its brief is to develop a flexible pipe design for offshore oil production in ultradeep waters in the pre-salt cluster. The study is scheduled for completion in December 2014.

After project technical validation, the possibility of setting up a production plant in Brazil will be evaluated.

[mappress]

Source:Petrobras , May 12, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free