Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Kraken Ready for Turbine Installation in Mostyn (UK)
Offshore Wind

May 19, 2011 · about 15 years ago

Kraken Ready for Turbine Installation in Mostyn (UK)

In the harbour of Mostyn, the first two wind turbines for Walney 2 have been loaded onto Kraken, and she is awaiting better wind conditions before leaving for the Walney 2 site. Also in the harbour in Mostyn, the installation vessel Leviathan is awaiting Kraken’s departure before it can take its pos

1 minutes read
  • LinkedIn
  • X
  • Email

In the harbour of Mostyn, the first two wind turbines for Walney 2 have been loaded onto Kraken, and she is awaiting better wind conditions before leaving for the Walney 2 site.

Also in the harbour in Mostyn, the installation vessel Leviathan is awaiting Kraken’s departure before it can take its position and load the next two turbines for Walney 2; the two vessels are sharing the same loading facilities in Mostyn.

Installation of the 51 turbines is planned to take half the time it took to install the turbines for Walney 1. This will load the infrastructure in the harbours of Mostyn and Barrow and be vital to in order plan the installation sequences carefully and secure the logistics.

About the Walney offshore windfarm:

The Walney Offshore Windfarm project is located approximately 15km west of Barrow-in-Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 – 3.6MW turbines, giving a total capacity of the Walney project of 367.2MW. The rotor diameter of the turbines is 107m for Walney 1 and 120m for Walney 2, with a maximum height of 150m from blade tip to sea level. The total area of the development is some 73km2.

[mappress]

Source: dongenergy, May 19, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free