Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Aker Solutions to Equip Two Brazilian FPSOs with Offloading Systems
Fossil Energy

May 26, 2011 · about 15 years ago

Aker Solutions to Equip Two Brazilian FPSOs with Offloading Systems

Aker Solutions has won two similar contracts, together worth approx. 120 million NOK, from CQG Oil & Gas Contractors Inc. and CCI Oil & Gas Contractors Inc., for the supply of Pusnes offloading systems(TM) to two FPSOs in the Brazilian market. The offloading systems will be installed on the two FPSO

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has won two similar contracts, together worth approx. 120 million NOK, from CQG Oil & Gas Contractors Inc. and CCI Oil & Gas Contractors Inc., for the supply of Pusnes offloading systems(TM) to two FPSOs in the Brazilian market.

The offloading systems will be installed on the two FPSOs P-58 and P-62, which are being converted and built for Petrobras.

The two FPSOs are spread moored FPSOs, and will use the field proven Pusnes offloading system(TM) at both bow and aft ends. These offloading systems include tanker mooring and crude oil transfer components as well as emergency offloading stations. Crude oil from the FPSOs will be loaded on to dedicated dynamic positioned shuttle tankers. Aker Solutions last year secured the mooring contracts for the same FPSOs.

The Pusnes offloading system(TM) is recognised by the industry for having established an environmentally responsible, safe and secure connection from the FPSO via a crude oil hose to the dynamic positioned shuttle tanker’s bow loading system. In the event of an emergency, the oil flow can be quickly stopped and the vessels disconnected rapidly and safely.

“Aker Solutions’ mooring and loading systems have attained a unique position in Brazil. We have signed more than a dozen contracts for various clients in Brazil,” says Leif Haukom, head of Aker Solutions’ mooring and loading systems business.

As previously communicated, Aker Solutions is also supplying Pusnes mooring systems(TM) to P-58 and P-62, under the terms of a contract with Petrobras.

Aker Solutions is focusing on the Brazilian market with a wide range of offshore technologies and is expanding the local Lifecycle service organisation in parallel with making new sales.

Delivery of the offshore loading systems to P-58 and P-62 FPSOs will take place in 2011/2012. The contract party for Aker Solutions is Aker Pusnes AS.

120 million Norwegian kroner = 21.60288 million U.S. dollars

[mappress]

Source: Aker Solutions, May 26, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free