Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›ENTREPOSE Wins Contract to Build Three Cryogenic Tanks for Dunkirk LNG (France)
Clean Fuel

June 7, 2011 · about 15 years ago

ENTREPOSE Wins Contract to Build Three Cryogenic Tanks for Dunkirk LNG (France)

ENTREPOSE Contracting, a contractor specialised in the design and construction of complex projects in the oil and gas sectors in particular, and the energy and environmental sectors in general, today announced the signature of a contract to construct three cryogenic tanks for the Dunkirk LNG Termina

2 minutes read
  • LinkedIn
  • X
  • Email

ENTREPOSE Contracting, a contractor specialised in the design and construction of complex projects in the oil and gas sectors in particular, and the energy and environmental sectors in general, today announced the signature of a contract to construct three cryogenic tanks for the Dunkirk LNG Terminal.

The contract, won in a consortium between lead contractor ENTREPOSE Contracting and Bouygues Travaux Publics, was signed with EDF’s subsidiary, Dunkerque LNG. It will involve the construction of three cryogenic tanks for the storage of liquefied natural gas (LNG), each with a capacity of 190,000m3. Each of the three tanks, which are among the biggest built in the world, are of full-containment type and will be constructed with an inner tank of 9% nickel-alloy steel, complete with perlite insulation to keep the LNG at a temperature of -163°C, and a prestressed-concrete o uter wall.

This turnkey contract, which will be subject to the strictest environmental and safety constraints in the oil and gas industry, will cover engineering, equipment supply, construction and pre-commissioning trials on the tanks.

The work is due to start at the beginning of 2012 at the latest, following completion of the current preliminary engineering work. Commissioning of the tanks is expected in 2015.

Dominique Bouvier, ENTREPOSE Contracting’s Chairman and CEO , commented: “ We are pleased with this fine result and delighted to participate in this major project with Dunkerque LNG (EDF group). Our subsidiary CMP Dunkerque will obviously make a strong contribution to the project. The award of this contract confirms ENTREPOSE Contracting’s position as a global leader in turnkey projects involving LNG storage tanks .”

[mappress]

Source: ENTREPOSE Contracting, June 7, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free