Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›HHI Lands FSRU Order from Hoegh LNG (South Korea)
Clean Fuel

June 13, 2011 · about 15 years ago

HHI Lands FSRU Order from Hoegh LNG (South Korea)

Hyundai Heavy Industries, the world’s biggest shipbuilder, announced the Company clinched a USD 500 million order to build the world’s first two new LNG Floating Storage Regasification Units (FSRU) for Hoegh of Norway on June 12. This contract also includes an option exercisable by Hoegh to order tw

2 minutes read
  • LinkedIn
  • X
  • Email

Hyundai Heavy Industries, the world’s biggest shipbuilder, announced the Company clinched a USD 500 million order to build the world’s first two new LNG Floating Storage Regasification Units (FSRU) for Hoegh of Norway on June 12.

This contract also includes an option exercisable by Hoegh to order two additional same-class LNG FSRUs

The 170,000 cbm LNG FSRUs, measuring 294 meters in length and 46 meters in width, can store 70,000 tons of chilled natural gas. These two vessels are scheduled to be delivered by the second half of 2013 and the first half of 2014 respectively, and will operate for 40 years.

LNG FSRUs receive liquefied natural gas from offloading LNG carriers. The installed regasification system provides gas send-out through flexible risers and pipelines to shore. Typically, LNG FSRUs are converted from other ships but these will be the world’s first new LNG FSRUs.

LNG FSRUs take a year less and cost half as much as an onshore LNG terminal to complete. Furthermore, Hyundai Heavy’s special engineering techniques help shipowners save on maintenance downtime as the maintenance interval is extended from five years to ten. Converted LNG FSRUs need to be drydocked for repairs and maintenance for two to three months every five years.

An official from the shipbuilding giant said, “ We see this order as the beginning of the global LNG FSRU order trend. Considering more than 10 LNG projects are underway in countries including Brazil and Indonesia, we expect more orders down the road. ”

Hyundai Heavy has won orders for 53 ships including LNG carriers, LPG carriers, shuttle tankers, and LNG FSRUs worth of USD 13.5 billion so far this year.

[mappress]

Source: HHI, June 13, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free