Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Philippines: Nido Petroleum Provides Gindara-1 Drilling Update (June 14)
Business & Finance

June 14, 2011 · about 15 years ago

Philippines: Nido Petroleum Provides Gindara-1 Drilling Update (June 14)

Nido Petroleum Limited , on behalf of the SC 54B Joint Venture, provided the following update on the Gindara-1 well. As of 6.00 am (WST) on 14 June 2011, following completion of the 9 5/8” casing operations, the Gindara-1 well has now been drilled from 3,345 metres MD (3,323 metres TVDss) to 3,384 m

2 minutes read
  • LinkedIn
  • X
  • Email

Nido Petroleum Limited , on behalf of the SC 54B Joint Venture, provided the following update on the Gindara-1 well.

As of 6.00 am (WST) on 14 June 2011, following completion of the 9 5/8” casing operations, the Gindara-1 well has now been drilled from 3,345 metres MD (3,323 metres TVDss) to 3,384 metres MD (3,362 metres TVDss).

During the drilling of this interval, the top of the primary Nido Limestone reservoir was encountered at a provisional depth of 3,378 metres MD (3,356 metres TVDss). At the time of this report, approximately 6 metres of thin, potentially non-porous limestone interbedded with shale and interpreted to represent the top of the Nido Limestone had been penetrated before pulling out of hole to replace the Logging Whilst Drilling (LWD) tools.

During the drilling of the interbedded limestone and shale section marking the top of the Nido Limestone, mud-log gas shows (C1 to C5) were recorded in thin limestone beds. However, due to the limited penetration of the Nido Formation so far, the non-porous nature of the thin limestone layers encountered and the LWD logging tool being inoperable, the significance of these initial findings require evaluation through further drilling of the Nido Formation reservoir section, evaluation by the LWD and potentially a more comprehensive electric logging suite.

Following replacement of the LWD and possible bit-change operation, the forward program is to continue drilling the Nido Limestone from the current depth of 3,384 metres MD (3,362 metres TVDss) to the planned Total Depth of 3,650 metres MD (3,628 metres TVDss), an interval of approximately 266 metres. On reaching Total Depth, the SC 54B Joint Venture will decide on the scope of the formation evaluation program required to conclusively evaluate the Nido Limestone interval.

Jon Pattillo, Nido’s Head of Exploration commented, “We appear to have just drilled the very top of the Nido Limestone before deciding to trip out to replace the LWD. We expected, based on surrounding well results, that the uppermost part of the Nido Limestone could be potentially non-porous reservoir. The fact that we have observed mud-log gas shows (C1 to C5) in the thin limestone beds means we need to complete the drilling of the Nido Limestone section to understand the significance of these preliminary findings. We look forward to recommencing drilling operations in the next 24 hours with further drilling results from the well expected in the following days.”

[mappress] Source: Nido, June 14, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago