Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: Aibel Installs Winches for Pull-in of Risers on Statoil’s Gullfaks C Platform
Fossil Energy

July 7, 2011 · about 15 years ago

Norway: Aibel Installs Winches for Pull-in of Risers on Statoil’s Gullfaks C Platform

Aibel is installing two winches for pull-in of risers on the Gullfaks C platform for Statoil. The assignment is awarded as a contract amendment. The estimated value is NOK 100 million. The winches will be used in the work with replacing the existing pipeline between Gullfaks C and Tordis, which is a

1 minutes read
  • LinkedIn
  • X
  • Email

Aibel is installing two winches for pull-in of risers on the Gullfaks C platform for Statoil. The assignment is awarded as a contract amendment. The estimated value is NOK 100 million. The winches will be used in the work with replacing the existing pipeline between Gullfaks C and Tordis, which is a fully developed subsea facility.

‘This represents another exciting project in our portfolio, and is the second one we get from Statoil this week ,’ says President and CEO Jan Skogseth in Aibel AS .

He refers to a letter of intent that Aibel received on Tuesday, regarding work worth NOK 200 million on a new test facility for subsea compressors at Kårstø.

Part of Visund South contract

In December last year Aibel was awarded a modification contract on Gullfaks C in connection with the fast-track development of the Visund South field. The new installation assignment is awarded as an amendment to this contract.

Aibel is responsible for engineering, procurement, fabrication and installation.

The project is managed from Aibel’s office in Bergen, with assistance from Haugesund, Oslo and Singapore. The project work has already started. It ends in October 2012.

[mappress] Source: Aibel, July 7, 2011.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free