Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Forewind Deploys ZephIR 300 to Collect Wind Data on Dogger Bank (UK)
Operations & Maintenance

July 14, 2011 · about 15 years ago

Forewind Deploys ZephIR 300 to Collect Wind Data on Dogger Bank (UK)

A laser wind-profiling instrument to provide measured wind data for the Dogger Bank offshore wind farm development has been deployed by Forewind on a gas platform 125 kilometres from shore. The ZephIR 300 wind lidar, which will measure wind speeds at heights of up to 200m using an infrared laser, ha

2 minutes read
  • LinkedIn
  • X
  • Email

A laser wind-profiling instrument to provide measured wind data for the Dogger Bank offshore wind farm development has been deployed by Forewind on a gas platform 125 kilometres from shore.

The ZephIR 300 wind lidar, which will measure wind speeds at heights of up to 200m using an infrared laser, has been installed on the Cavendish offshore gas platform situated around 25 kilometres south of the 8660 km2 Dogger Bank Zone.

Lidar (light detection and ranging) equipment is used extensively for atmospheric research and meteorology.

Platform operator RWE Dea UK installed the lidar last week on behalf of Forewind and will maintain the unit throughout the planned four-year deployment.

The dataset collected will be the first high-quality wind data measurement in close proximity to the Dogger Bank Zone, and will be used alongside wind data collected by the Forewind met masts due to be installed in the zone next year.

Forewind Head of Engineering and Supply Chain, Mark Legerton said that the lidar will give data on the local wind characteristics for use in early site design activities.

“ It will also improve the evaluation of the overall project wind resource by enhancing the validation of local wind modelling ,” Dr Legerton said.

The cutting-edge ZephIR 300 wind lidar was manufactured and provided by renewable energy consultancy Natural Power, who also supervised the installation and commissioning on the platform.

“ The ZephIR 300 was chosen because it is a proven, reliable and safe technology, able to economically provide high quality wind data in an offshore environment, ” he added.

“ The Dogger Bank project relies on innovative flexible solutions and close cooperation with suppliers. This successful lidar deployment is an example of this – only made possible through Natural Power’s responsiveness and an excellent working partnership with the platform operator RWE Dea UK.”

[mappress]

Source: Forewind, July 14, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago