Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›MOEA Announces Taiwan Wind Power Development Plan
Offshore Wind

July 19, 2011 · about 15 years ago

MOEA Announces Taiwan Wind Power Development Plan

Taiwan will boost its wind power capacity from 530 megawatts to 4,200 megawatts by 2030 under an ambitious renewable energy plan unveiled July 18 by the Ministry of Economic Affairs. The project, which is expected to generate NT$500 billion (US$17.27 billion) in business for Taiwan’s equipment manuf

2 minutes read
  • LinkedIn
  • X
  • Email

Taiwan will boost its wind power capacity from 530 megawatts to 4,200 megawatts by 2030 under an ambitious renewable energy plan unveiled July 18 by the Ministry of Economic Affairs.

The project, which is expected to generate NT$500 billion (US$17.27 billion) in business for Taiwan’s equipment manufacturers and component suppliers, calls for the installation of 1,050 wind turbines on land and offshore sites.

“Taiwan will install 450 land-based wind turbines with a capacity of 1,200 megawatts by 2020,” MOEA Minister Shih Yen-shiang said, adding that the remaining units will be set up in the following 10 years.

At present, Taiwan has around 300 land-based turbines situated mainly along the western coastline and in outlying Penghu County.

The new units will be able to generate 12.5 billion kilowatt hours of electricity, or 3.3 percent of Taiwan’s total power generation. These turbines will double renewable energy to 16 percent of Taiwan’s total capacity.

Shih said the MOEA will subsidize the construction of two offshore wind power farms by 2015 through covering 50 percent of equipment costs and providing successful tenders with a one-off payment of NT$250 million.

The MOEA said a number of firms have expressed interest in the program, including Taiwan Generations Corp., state-run Taiwan Power Co. and Teco Electric and Machinery Co. Ltd. Possible locations include Chiayi, Changhua and Yunlin counties.

Details of the initiative are yet to be finalized, the MOEA said, with a formal announcement expected to be made by the end of August.

By Meg Chang ( taiwantoday )

[mappress]

Source: taiwantoday, July 19, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindAuthorities & GovernmentBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free