Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›The Netherlands: Al Samriya LNG Carrier Arrives at Gate Terminal
Clean Fuel

July 27, 2011 · about 15 years ago

The Netherlands: Al Samriya LNG Carrier Arrives at Gate Terminal

The liquefied natural gas carrier „Al Samriya‟ berthed today, July 27, at Gate terminal, the Netherlands The “Al Samriya” is third LNG carrier that delivers its commissioning cargo for Gate LNG project after the arrival of the „British Trader‟ and the “Arctic Voyager‟. Prior to the start of commerci

1 minutes read
  • LinkedIn
  • X
  • Email

The liquefied natural gas carrier „Al Samriya‟ berthed today, July 27, at Gate terminal, the Netherlands The “Al Samriya” is third LNG carrier that delivers its commissioning cargo for Gate LNG project after the arrival of the „British Trader‟ and the “Arctic Voyager‟.

Prior to the start of commercial operations of Gate terminal in September 2011, the installations will be tested extensively for several months. In the first phase of this so called commissioning period, the tanks and pipelines are cooled down to -162 degrees Celsius. That is the temperature of the liquefied natural gas which will be supplied by LNG-carriers, stored in the three tanks at the terminal and then be supplied to the Dutch transmission network.

The development of Gate terminal has been on schedule since the start of the construction in 2008. Gate terminal expects to start commercial operations in September 2011. The throughput capacity of the terminal will be 12 billion m3 of natural gas per year. Gate terminal is the first LNG terminal built in the Netherlands and will deliver an important contribution to the security of supply of gas in the Netherlands and the rest of Europe. Through this terminal, the Netherlands is connected to gas flows from around the world, which will further strengthen the position of the Netherlands as gas roundabout in Europe.

[mappress] July 27, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free