Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Marine Management Organisation and Natural England Conduct Licence Inspection for Walney 2 (UK)
Offshore Wind

July 29, 2011 · about 15 years ago

Marine Management Organisation and Natural England Conduct Licence Inspection for Walney 2 (UK)

On 29 June 2011, Marine Management Organisation and Natural England conducted a site visit at Walney 2 for inspection of the current Marine Licence. The aim of the visit was to inspect Walney Offshore Windfarms implementation of the marine mammal mitigation during piling of monopiles by Svanen. Nois

1 minutes read
  • LinkedIn
  • X
  • Email

On 29 June 2011, Marine Management Organisation and Natural England conducted a site visit at Walney 2 for inspection of the current Marine Licence.

The aim of the visit was to inspect Walney Offshore Windfarms implementation of the marine mammal mitigation during piling of monopiles by Svanen.

Noise from piling of monopiles may impact marine mammals and cause disturbance or even injury to animals appearing close to the piling. Therefore a vessel with marine mammal observers (MMO) is in place during each piling to ensure a ‘marine mammals free’ sea in a radius of 500m from the piling location. This is done by visual observation in combination with applying Passive Acoustic Monitoring (PAM) equipment. This implementation of the licence requirements is given in a Marine Mammal Mitigation Programme.

The inspection was conducted by two staff members from Marine Management Organisation and one staff member from Natural England.

The Walney Offshore Windfarm

The Walney Offshore Windfarm project is located approximately 15km west of Barrow-in-Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 – 3.6MW turbines, giving a total capacity of the Walney project of 367.2MW. The rotor diameter of the turbines is 107m for Walney 1 and 120m for Walney 2, with a maximum height of 150m from blade tip to sea level. The total area of the development is some 73km2.

[mappress]

Source: dongenergy, July 29, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindEnvironment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free