Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›India: Jubilant Releases Appraisal Well DDE-APP-1 Results
Business & Finance

August 11, 2011 · about 15 years ago

India: Jubilant Releases Appraisal Well DDE-APP-1 Results

In Tuesday, Jubilant announced the results of Appraisal Well DDE-APP-1 in the Deen Dayal East Field in the KG Block, which was spudded on the 1st of January 2011. The well was drilled by the operator (GSPC), with the objective of appraising the hydrocarbon bearing sands of the KG-16 discovery well a

2 minutes read
  • LinkedIn
  • X
  • Email

In Tuesday, Jubilant announced the results of Appraisal Well DDE-APP-1 in the Deen Dayal East Field in the KG Block, which was spudded on the 1st of January 2011.

The well was drilled by the operator (GSPC), with the objective of appraising the hydrocarbon bearing sands of the KG-16 discovery well and, in the process, to test the Cretaceous and Jurassic Rift Fill and younger sandstones that were found to be productive in other wells on the Deen Dayal structural complex. The well was drilled to 5,621 metres measured depth and encountered basement at 5,530 metres measured depth.

Two Drill Stem Tests (DST) were undertaken after electric logging of the lower section of the well. DST-1 was undertaken in the rift fill section with perforation between 4,957 to 4,970 metres measured depth. This test flowed water at an average rate of 1500 bwpd and carbon dioxide ranging 20% to 28% was found in the well stream. DST-2A was undertaken in a shallower section with perforation between 4,774 to 4,786.5 metres measured depth and 4,789-4,799.5 metres measured depth. This flowed gas at 0.73 mmscfd with condensate at 60 bcpd from a 12/64 inch choke; 6% constant carbon dioxide was observed during the test.

The authorised cost to drill and test the well was approximately USD 75 million (USD 7.5 million net to Jubilant), the actual cost to date is approximately USD 69 million (USD 6.9 million net to Jubilant). The rig is currently waiting for a suitable weather window to move to the Well Head Platform.

Jubilant holds a 10% participating interest in this block through its subsidiary Jubilant Offshore Drilling Private Limited in India. Gujarat State Petroleum Corporation Limited, with an 80% participating interest, is the operator for the block. Geo Global Resources holds 10%.

Ajay Khandelwal, CEO of the Company commented:

“The results of this well are not as expected and the operator is undertaking a full evaluation of the results. Any impact on 2C resources for DDE will be declared following a detailed evaluation by the operator and independent reserves consultants. Any evaluation will also take into account the possible upside of 2C resources from 20.5 square kilometre development area extension, as previously announced.”

[mappress] Source: Jubilant, August 11, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago