Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ConocoPhillips China Identifies More OBM, CNOOC Says
Business & Finance

August 12, 2011 · about 15 years ago

ConocoPhillips China Identifies More OBM, CNOOC Says

CNOOC Limited announced that, according to the latest statement by ConocoPhillips China Inc (COPC), the Operator of Penglai 19-3 oil field, more oil-based drilling mud (OBM) on the sea floor was identified. This addition brings the revised volume of OBM on the seabed to 400 cubic meters (2,500 barre

2 minutes read
  • LinkedIn
  • X
  • Email

CNOOC Limited announced that, according to the latest statement by ConocoPhillips China Inc (COPC), the Operator of Penglai 19-3 oil field, more oil-based drilling mud (OBM) on the sea floor was identified.

This addition brings the revised volume of OBM on the seabed to 400 cubic meters (2,500 barrels). The volume of oil released to the sea surface remains at 114 cubic meters (717 barrels). The total volume of fluids spilled from the incident amounts to 514 cubic meters (3,217 barrels) of oil and OBM and exceeds 240 cubic meters (1,500 barrels) as originally estimated by the Operator.

After the incident occurred, COPC has deployed substantial resources for oil recovery and cleanup work. According to COPC, its response personnel has recovered 269 cubic meters (1,700 barrels) of OBM from the seabed near the Penglai 19-3 C platform, and approximately 70 cubic meters (440 barrels) of oil/water mix from the sea surface to date.

As the non-operator, the Company has also fully utilized its resources and personnel to assist COPC on shoreline protection activities with 111 people walking approximately 3,289 kilometers of shoreline and 19 vehicles patrolled approximately 48,645 kilometers of shoreline along the Bohai Bay area by 11 August.

In order to meet the requirements set by the State Oceanic Administration, the Company will continue to urge and assist COPC to stop the leaks and complete the cleanup work by the end of August, so as to minimize the impact of the oil spill incident on the marine environment.

[mappress] Source: CNOOC, August 12, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago