Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›A&P Completes Mid Water Arch Subsea Structure (UK)
Subsea

August 16, 2011 · about 15 years ago

A&P Completes Mid Water Arch Subsea Structure (UK)

A&P TYNE is building on its success in a new business sector with the completion of yet another subsea structure for an offshore oil and gas field. The Mid Water Arch – used to support control cables as they rise from the seabed to the surface – left the ship repair and fabrication yard at […

1 minutes read
  • LinkedIn
  • X
  • Email

A&P TYNE is building on its success in a new business sector with the completion of yet another subsea structure for an offshore oil and gas field.

The Mid Water Arch – used to support control cables as they rise from the seabed to the surface – left the ship repair and fabrication yard at Hebburn, bound for a North Sea oil field.

For the last six months, 50 men worked daily on the project to cut, shape and weld the shell-like structures wrapped around two pressurised buoyancy cylinders. The entire structure is built in steel and the yard also built the gravity base, clump weights and piles that will secure it to the seabed, weighing a massive 600 tonnes altogether.

The subsea arch is headed for the Athena Development in the Outer Moray Firth, which will be operated by Ithaca Energy. The field is expected to produce around 22,000 barrels of oil per day once production starts.

It is the second such order secured by A&P, earlier this year it completed two buoyant subsea structures for an African offshore oil field.

Project director Iain Campbell said: “ This job was totally different in that the Athena arch is supported by pressurised steel cylinders as opposed to the polymer buoyancy units the earlier subsea arches were built around.

[mappress] Source: ap-group, August 16, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free