Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Vietnam: SOCO Announces First Flow from Te Giac Trang Field
Business & Finance

August 22, 2011 · about 15 years ago

Vietnam: SOCO Announces First Flow from Te Giac Trang Field

SOCO announced the first flow of crude oil and wet gas from the Te Giac Trang Field, which occurred at 06:55 local time in Vietnam today. The block is operated on behalf of SOCO and its Partners, PetroVietnam and PTT Exploration and Production Public Company Limited, by the Hoang Long Joint Operatin

2 minutes read
  • LinkedIn
  • X
  • Email

SOCO announced the first flow of crude oil and wet gas from the Te Giac Trang Field, which occurred at 06:55 local time in Vietnam today. The block is operated on behalf of SOCO and its Partners, PetroVietnam and PTT Exploration and Production Public Company Limited, by the Hoang Long Joint Operating Company (‘HLJOC’), which was established in 1999.

The TGT Field, discovered in August 2005, was approved for the initial development by the Government of Vietnam in September 2009. The development is comprised of a Floating, Production, Storage and Offloading vessel (‘FPSO’), two Well Head Platforms (H1 and H4 areas), and a subsea pipeline system to transport hydrocarbons, gas export, gas lift and water for injection.

Crude oil from the TGT Field is transported via a subsea pipeline system to the FPSO ‘Armada TGT 1′, which has a name plate processing capacity of 55,000 barrels of oil per day (‘BOPD’), where it is processed, stored and exported via tankers to regional oil refineries. Gas will be transported through a pipeline to the nearby Bach Ho Facilities for processing and transportation to shore via the existing pipeline infrastructure for further distribution to meet domestic demand. TGT oil output is expected to plateau at approximately 55,000 BOPD and gas production will be approximately 30 million cubic feet per day.

The development of the TGT Field marks a successful investment co-operation milestone in the Vietnam oil and gas industry with the delivery of production within two years of approval.

In addition to starting first production from the TGT Field H1 area, HLJOC continues drilling production wells in the H4 area of the TGT Field and fabricating Platform Topsides in preparation for its petroleum production start-up in August 2012.

Ed Story, President and Chief Executive of SOCO , commented:

“We are very pleased to announce first oil from the TGT Field in Vietnam, a key milestone for the Company demonstrating our ability to see our exploration successes through to the production stage. The project always had an ambitious delivery target and we are pleased to have achieved this.

Our strong partnerships have allowed this significant event at the TGT Field to be realised and we now look forward to targeting further exploration and development success, both in Vietnam and in Africa.”

[mappress]

Source: SOCO, August 22, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free